From the first site survey to final commissioning, we handle the full installation: shaft and machine-room assessment, equipment selection, mechanical and electrical installation, safety testing and handover.
We size each system to the building — traffic, floors, load and architecture — and document every elevator in our operations platform so its history starts on day one.
- Site survey and traffic analysis
- Passenger, home, MRL, hydraulic and freight systems
- Safety testing to applicable standards
- Clean handover with documentation